COSTS

After reviewing your specific water chemistry, most installations will cost $500 to $600 per acre foot for each mg/l (1 ppm) of boron removed, including residuals management. But, this solution is not for everyone. Smaller operations do not have enough water needs for the cost benefit.  500 gpm wells and greater. Growers with greater water needs and higher value crops will see the most benefit. 

All other costs for the treatment plant, brine management, and operations and maintenance will be provided. Here’s how it works. The land owner provides a space to install equipment, concrete pad, utilities connections and a shed to cover it (about 8000 sqft). Wallace Group does everything else.  We take care of the site design, brine management, operations and maintenance.  Very little capital requirement and no ongoing risk